WorkQuote

Before you buy material

Estimate maker for site work

Build a job estimate with quantity, rate, and amount in INR before you buy material. Add GST only if you charge it, then preview the client PDF.

An estimate is how you price the job before cement, boards, or wire are purchased. It keeps the client’s approval and your buying list from drifting apart.

Quotation formats for India

Open a trade, read the sample lines, then replace the rates with yours.

What is an estimate?

An estimate is how you price the job before cement, boards, or wire are purchased. It is the number the client approves, and the list you buy against. If those two drift apart, the missing material comes out of your margin.

A lump sum is hard to defend when a size changes. Lines show where the money goes.

What should an estimate include?

Client, site, and one line per material and labour gang: description, quantity, unit, rate, and amount. Put wastage inside the quantity you can explain, not as a mystery row.

Keep a separate material list when the client is buying, or when you want the site receipt checked against the estimate. Both can sit on the same project after you sign in.

Ways to build an estimate

  • Quantity × rate

    The amount is the quantity times the rate you type. You should be able to redo that multiplication in front of the client.

  • Trade by trade

    Masonry, flooring, paint, and wiring each get lines. A trade the client might remove should not be buried in another rate.

  • Wastage in the quantity

    For tiles, boards, and wire, add the extra in the quantity and say so. A line called “wastage” with no basis starts an argument.

  • Client-supplied material

    If they pay the shop, keep labour on the estimate and purchases on a material list. Do not charge the material again.

  • Selling rate, not the shop bill

    The PDF shows the rate you enter. Many contractors type the rate they charge, not their purchase price.

Sample estimate

Floor tiles, 2x2 ft180 sq ft · sample rate₹16,200
Tile adhesive and spacers8 bags · sample rate₹3,600
Mason, flooring labour180 sq ft · sample rate₹7,200

A flooring estimate. Replace the rates with what you pay and what you charge.

How to create an estimate

  1. 1. Start in the browser

    Create an estimate, name the client and the site, and add one line per material and labour item.

  2. 2. Replace the sample rates

    The numbers on this page are examples, not a price list. Type the quantity, unit, and rate you actually charge in your city. Add GST only if this job is taxed.

  3. 3. Preview the PDF, then send it

    You can build the quotation without an account. Sign in with Google when you want the PDF, a WhatsApp file, or the job saved to your account.

Create an estimate

Questions

Should the estimate include wastage?

Yes, inside the quantity. For tiles, boards, and wire, contractors usually add a small extra in the quantity rather than a mystery line called wastage. Write it so you can explain it.

Can the client see my purchase rate?

Only if you type it. The PDF shows the rate you enter. Many contractors enter their selling rate, not the shop bill.

What if the site measurement changes?

Edit the quantity and preview again. Sign in so the earlier version stays on your account instead of only in this browser.